770.988.0400

Fort Hood H-Frame Barracks Renovation

Client: US Army Corps of Engineers (USACE) Fort Worth

Location: Fort Hood, Killeen, Texas

Engineering Design Technologies, Inc. (EDT) served as the Construction Manager, the Prime Contractor and Designer-of-Record on the Design-Build delivery of Barracks Buildings 9213 and the Central Energy Plant (CEP) building 9417. The Mechanical System provided was selected with consideration for high efficiency, reliability; HVAC Systems with highly efficient Air Handling Units and Fan Coil Units; Highly Efficient Domestic Hot Water Heating System; High Efficiency Motors (Fans & Pumps) with NEMA Premium type will be used to conform for Energy Conservation; Variable Frequency Drive (VFD) to control the motor speeds (when applicable) for Energy Conservation; Use of DOAU with Energy Recovery Wheel to provide cooling and dehumidification of outside air to ensure comfort of occupants and provide Energy Conservation; Highly Efficient Lighting System to achieve Energy Consumption meeting the minimum requirements of ASHRAE 90.1-2010 and ASHRAE-189.1.


The following excerpted testimonial, provided by Mr. Andrew Bury PE, Resident Engineer, US Army Corps of Engineers as the assessing official, is from the Final Contractor Performance Assessment Report (CPAR). “The Contractor provided a high-quality renovation by the contact required completion that our customer has been happy with to date.”

© 2026 Engineering Design Technologies, Inc. All Rights Reserved. Website by Appeal Design

Request Information

Please feel free to contact us for information about EDT's services.

Leave this empty:


Rather Make a Phone Call?

No Problem, Give us a call

770.988.0400